First we had to figure out how to get the current one out.
Notice Bman is helping with his hammer.
It really wasn't too hard once we figured out that the easy way was to take the door off and then pull the frame inward.
We went to put the new door in and of course the opening wasn't wide enough. The old owners made some weird rig to make the opening smaller for the awesome cheap door they hung. Once we took that off we were all set. We slid the door in, made sure it was straight and plumb, and nailed it in. Success! Until, we went to shut the door. Apparently being plumb isn't enough to close a door. The floor wasn't perfectly level, something that slipped our minds in the 100 degree heat. So we had to cut out the nails, relevel the door, and 4.5 hours after we started the door was in.
One more project off the list, but I now added three more because I want to get a new light, revamp the mailbox, and make a painted plexiglass address plaque for the front.



No comments:
Post a Comment